Test report DSG-6886 · Rev E · tested October 10, 2026

Memory & StorageDevice under test

SK Group memory chief brands DRAM prices 'abnormally high'; US fab under review

SK Group's memory chief publicly called DRAM prices "abnormally high," a rare concession from a top supplier. The group's chairman is weighing a US fab to expand output and calm chipflation.

Read
3 min
Words
566
Node
14nm
Operator
Marcus Bennett

Spec summary

  1. SK Group memory chief described current DRAM prices as 'abnormally high'
  2. SK Group chairman is evaluating a US semiconductor fabrication plant
  3. Stated goal of the US project is to expand supply and ease chipflation
  4. Three suppliers — including SK Group — dominate the global DRAM market
  5. A new advanced-node fab would typically require 36 to 60 months to reach volume production

SK Group's memory-chip chief publicly conceded this week that DRAM contract pricing has reached "abnormally high" levels — a rare admission from a supplier that typically avoids commenting on market conditions. The disclosure came as the SK Group chairman indicated he is weighing construction of a new semiconductor fabrication facility on US soil to expand supply and ease what the industry has labeled "chipflation."

What did the memory chief actually say?

The SK Group memory executive used the phrase "abnormally high" when describing current DRAM pricing. The characterization carries weight because SK Group is one of three suppliers that collectively dominate global DRAM output. Publicly labeling a market as overheated is unusual; chipmakers generally prefer rising prices and have little reason to draw buyer attention to the cycle.

The admission matters because memory pricing flows directly into the bill of materials for personal computers, smartphones, servers, networking gear, GPUs, and automotive electronics. When DRAM and NAND rise sharply, downstream brands absorb the cost, raise sticker prices, or shift to lower-density configurations.

Why is SK Group targeting the United States?

A US-based fab would diversify the group's manufacturing footprint beyond South Korea and place production closer to North American customers:

  • Hyperscale cloud operators running AI training clusters
  • AI accelerator vendors packaging high-bandwidth memory stacks
  • Automakers integrating advanced driver-assistance silicon
  • Defense and aerospace contractors seeking domestic sourcing

A US site would also align the group with federal manufacturing incentives, including CHIPS Act funding, and hedge geopolitical risk for buyers seeking non-Asian supply for strategic components.

How severe is the current pricing cycle?

Memory pricing moved upward from late 2023 through 2024, driven by constrained leading-edge capacity and surging demand for high-bandwidth memory (HBM) used in AI accelerators. Conventional DDR5 and DDR4 modules, which serve the broader PC and server market, climbed alongside the HBM segment.

This cycle mirrors previous memory upturns of 2017–2018 and 2020–2021, each of which ended in a sharp correction once suppliers added capacity and demand normalized. The "abnormally high" framing suggests the current leg is approaching levels that historically trigger buyer restraint.

Can a new fab actually ease chipflation?

A US fab announced now would not deliver meaningful wafer output before the second half of the decade. Near-term relief will more likely come from yield improvements and incremental line conversions at the group's existing Korean facilities, together with demand normalization as hyperscale buyers digest AI-related inventory accumulated over the past 18 months.

Analysts broadly expect memory pricing to peak in 2025 before easing as supply additions arrive. The chairman's signaling of US expansion fits that timeline: a project announced in 2025 would target the next upcycle rather than the current one, positioning the group to capture both peak and post-peak demand.

What changes for component buyers?

For PC OEMs, smartphone brands, and server integrators, near-term pricing relief is limited. Capacity tied to any announced US facility will require environmental review, groundbreaking, and a multi-year ramp — historically a 36-to-60-month sequence for advanced nodes.

Procurement teams managing component cost through 2025 should focus on contract timing, dual-sourcing across the three major DRAM suppliers, and configuration shifts toward lower-density modules where workloads permit. The memory chief's public acknowledgment of "abnormally high" prices gives those teams an industry-grounded reference point in price renegotiations.

via Google News: DRAM chip (Source)

Filed under

  • dram
  • sk-group
  • hbm
  • chips-act
  • memory-pricing
Share this article:

More from Marcus Bennett

Marcus Bennett

Show full bio

News editor covering regulation, policy and their impact on hardware layer of artificial intelligence at Die Signal.

314 articles

Same lot · LOT-C1C6

« Previous articleNext article »